Improvement Of Existing Irrigation Infrastructure Works On Kakarapar Left Main Canal At Ch.55952.00 M. & Ch.57668.00 M. (village Road Bridge)
Improvement Of Existing Irrigation Infrastructure Works Of Fall @ 2950 M (9 Rd) On Amalsad Branch Canal
Improvement Of Existing Irrigation Infrastructure Works On Fall Ch. 28106.00 M (rd-92.212) Of Ubhrat Branch Canal.
Improvement Of Existing Irrigation Infrastructure Works On Vrb Cum Hr Cum Cr 8060m(26rd) On Amalsad Branch Canal
Improvement Of Existing Irrigation Infrastructure Works & Lining Of 5-r Sm Ch. 0.0 To 850.0 Mt. , 9-l Sm Ch. 0.0 To 975.0 Mt. , 12-l Sm Ch. 0.00 M To 3795.00 M, 13-l Sm Ch. 0.00 To 1097.00mt. , 17-r Sm Ch. 0.00 To 2012.00 Mt. Ex. Navsari Br. Canal, C.r Structure At Ch. 23123.00 Mt., 23535.00 Mt. & 28353.00 Mt Ex
Improvement Of Existing Irrigation Infrastructure Works On Aat Distry Ex. Navsari Branch, Onjal Mr. Ex. Aat Distry.,1-r Sm Ex Onjal Mr.,2-r Sm Ex. Onjal Mr.,dandi Mr. Ex. Aat Distry
Improvement Of Existing Irrigation Infrastructure Works On Kakarapar Left Bank Main Canal At Ch.51401.00 Mt (village Road Bridge)
Carrying Out Necessary Repairs And Restoration Works For Ghod Right Bank Canal In Km 0 To 30 And Left Bank Canal In Km 0 To 73 As Well As Its Selected Distributaries, Also Carrying Out Allied Works Under Maharashtra Irrigation Improvement Programme.
G-20 Road Length 5, 6 Km, Planting Of Flowering Trees On Both Sides Of The Road, Cleaning Of Slopes, Preservation Of Hedges, Maintenance Of Industrial Works Including Irrigation System For One Year
Side Protection Work General-Irrigation Division Ernakul Rectification Works To The Left Bank Of Muvattupuzha River Downstream Of Mundiattu Kadavu In Ward No.1 Of Ramamangalam Panchayath