Internal Inspection Of 40 Mva Transformer Under Etd
Installation Of 10 Mva Transformer With Necessary Busbar Arrangement With Foundation And Structural Arrangement For Fixing Of Circuit Breaker And Allied Electrical Items At 33 Kv Main Sub Station Akkocp, Bnk Area.
Safe Position Shifting And Placing. B M And B Switch Gear Pvt. Ltd. Make, 3 Mva, 11kv/3.3kv, Sl. No. 541507/05-06/0261 Transformer Loading And Unloading, Shifting, Cable Cleaning, Placing, Primary And Secondary Cable Connection With Installation A Eastern Transformer And Equipment Pvt. Ltd. Make 1 Mva, 11kv/3.3kv, Sl. No. S-820-1 Transformer Oil Drain Out By Hand Pump, Primary And Secondary Cable Connection Out With Out 1 Mva Transformer From Transformer Room, Loading, Unloading, To Keep
Supply Of Frls Cable For 63.9 Mva Transformer
Replacement Of Faulty 40 Mva Transformer With Old 10 Mva Transformer In Switchyard Of Rihand Hydro Power Station, Pipri.
Replacement Of 145 Kv Bushing By New One Of 40 Mva And 200 Mva Transformer Under Etd
Installation Of 11/3.3 Kv, 1 Mva Transformer, 02 Nos Of 11 Kv Breaker, 01 No. Of 3.3 Kv Breaker, 3.3 Kv Submersible Pump Starter Along With Fabrication Of Chala With Iron Material For The Installation Of 3.3 Kv
Poh Of 01no 21.6 Mva, 132/27kv Power Transformer And Replacement Of 01no 132kv Double Pole Circuit Breaker At Rtss/jer Under Sse/psi/bls In Kharagpur Division Of S. E. Railway.
Earth Filling And Site Development At 110 Kv Terls Substation In Accordance With Approved Layout For 20 Mva Transformer Relocation Under Transgrid Downstream Project
Augmentation Of 33 Kv Switch Yard And Improvement Of 1.6 Mva Power Transformer At Mrs Under Ge Ramgarh Cantt