Construction For Development Of Pedestrian Subway At Nagerjala Trisection Agartala In Epc Mode Under Uidf Phase2 Including Defects Liability Period Of Eighteen Months
Construction Of Pedestrian Subway At Km.211/800-900 Between Rrb-nvf Stations In Connection With Increasing Sectional Speed Upto 130kmph. Sw-1: Rrb-jru Section: Construction Of Pedestrian Subway At Km.211/800-900 Between Rrb-nvf Stations In Connection With Increasing Sectional Speed Upto 130kmph. Sw-2: Launching Of Rcc Box Segments For Pedestrian Subway At Km.211/800-900 Between Rrb-nvf Stations.
Proposed Pedestrian Subway At Km 13/200-300 Near Sahakar Nagar, Nti Layout With Steps, Size : 1x4.00mx2.25m, Rcc Box. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later
Providing & Fixing Various Safety Fencing Like W Beam Crash Barrier/composite Upvc/weld Mesh / Benizol /bamboo Etc. Fencing With Provision Of Pedestrian Subway To Prevent Trespassing On Lnl- Pa - Dd Section
Construction Of Pedestrian Subway-18 Nos. With Pre-cast Rcc Box At Various Locations Between Tlnr And Alu Stations In Vm-tpj (chord Line) Section, Connection With The Increasing Of Sectional Speed To 130 Kmph.
Construction Of Pedestrian Subway-32 Nos. With Pre-cast Rcc Box At Various Locations Between Vm And Tlnr Stations In Vm-tpj (chord Line) Section In Connection With Increasing Of Sectional Speed To 130kmph.
Construction Of Pedestrian Subway-18 Nos. With Pre-cast Rcc Box At Various Locations Between Alu And Tpj Stations In Vm-tpj (chord Line) Section, Connection With The Increasing Of Sectional Speed To 130 Kmph.
Kannur -Mangalore Section - Proposed Pedestrian Subway 1X 2.50 M X 2.50 M Box At Km.879/500-600 Between Ullal And Tokkuttu Stations For Safe Passage Of Public.
Construction Of Pedestrian Subway Widening Of Service Road Construction Of Rcc Drain And Provision Of Streetlights In Kittur Village, Construction Of Fob At Km 484.600 In Hirebagewadi Village And Widening Of Narrow Structures At Identified Black Spo
Providing Service Road On Right Hand Side Of Irattai Eri Grade Separator At Km 15 2 15 8 R S Of Inner Ring Road In The Main Work Of Construction Of Grade Separator And Pedestrian Subway In Kolathur Irattai Eri At The Junction Of Perambur Redhill Tender Notice No 05 2025 26 Cmdp Do Dt 16.09.2025