Construction Of Rob In Lieu Of L C No 99 At Km 247 1 2 Of Bow String 1x62 Rcc Girder 2x15m And Limited Height Subway Of 1x5x3 M Between Selu Satuna Stations On Manmad Mudkhed Section In The State Of Maharashtra On Epc Mode
Construction Of Rob With 1x42 Mtr Composite Girder + 2x18 Mtr Composite Girder + 4x24.0 Mtr Rcc T- Beam Girder, Including Bridge Approaches With Re Walls In Lieu Of Existing Manned Lc- 447 At Km: 786/3-5 Between Sigadam- Cheepurupalli Stations Of Waltair Division In East Coast Railway
Signalling And Telecom Outdoor Cable Shifting Work Including Other Gears Inconnection With Following Work: I Strengthening/Rehabilitation/Reconstruction Of 10 Nos. Of Bridges Bridge No- 20, 25, 29, 65, 49, 48, 38, 41, 76 & 86 5 Nos. Box And 5 Nos. Pipe Pushing In Tkx-Bksc-Ksx-Muri Section Of Adra Division. Project Id: 12.01.32.24.3.50.009, Ii Proposal For Conversion Of 11 Nos. Of Bridge No. 35, 36, 34Up, 34Dn, 343Rd, 528, 528, 528, 528, 11 & 2Bk 1X12.2Mg Span Steel Girders Into 1X12.2Mg Psc Girder Including Rcc Jackting Bet Adra-Asansol, Ksx-Bksc, Tle-Bksc And Dma-Kpk Section In Adra Division. Project Id: 12.01.32.24.3.50.006, Iii Construction Of New Crew Lobby, Crew Waiting Hall, Crew Counseling Room, Toilet For Ladies & Gents On The 1St Floor Of The El Building At Anara.Project Id: 12.01.16.21.1.55.002, Iv Estimate In Connection For Augmentation Of Existing Crew Lobby At Bksc.Project Id: 12.01.16.21.1.55.002, V Provision Of Earth Leakage Detector Eld In Various Location In Adra Division.Project Id: 12.01.33.24.4.50.001. Vi Strengthening/Rehabilitation/Reconstruction Of Bridges, 31 No. By Pipe Pushing And 08 No. Rehabilitation In Mdn-Gba Section. Project Id: 12.01.32.23.1.11.002. Vii Strengthening/Rehabilitation/Reconstruction Of Bridges, 27 No. By Pipe Pushing And 08 No. Rehabilitation In Gba. Project Id: 12.01.32.23.1.11.003 In Adra Division.
Construction Of Formation Cutting 5/7 Mtr. Wide, Dumping Sites, Retaining Walls, Breast Walls, Cross-drainage Work Km 0/0 To 2/510 And 19.75 Mtr Rcc Box Girder Bridge At Rd 0/975. Construction Of Lower Safru Grauru Link Road Gp Reur Km 0/0 To 2/510 Under Nabard Ridf-xxviii
Construction Of Road Over Bridge Rob With Proposed Span 1X 36Mtr Composite Girder + 2X24mtr Composite Girder + 4X18.75Mtr Rcc T-Beam Girder At Rly. Km. 641/19-21 In Lieu Of Lc. No.341 At Km 641/17-19 In Between Jhadupudi - Sompeta Railway Station Main Line Under Khurda Road Division.
Replacement Of Existing Steel Girder By Rcc Psc U Type Slab & New Steel Girder In Ahmedabad Division
Sw-1: Replacement Of Steel Girder Up Line Bridge No.34 At Km: 303/940-962 Span 1x12.20m Steel Girder+2x3.05m Rcc Slab Land Arch Closed By Rcc Twin Box Of Size 2x5.0x4.451m Cast-in-situ. Sw-2: Ancillary Track Work
Shoranur - Ernakulam Section - Construction Of Proposed Road Over Bridge In Lieu Of Lc No. 36 Church Gate At Rly Km 56/000-100 B/w Pudukad And Irinjalakkuda Stations Of Thiruvananthapuram Division 7.50m Two Lane Carriageway, 2x30m Eff. Composite Girder For Railway Spans And 7x25m Psc Girder+ 2x10m Rcc Solid Slab For Approaches And Ernakulam - Kottayam - Kayamkulam Section - Construction Of Proposed Road Over Bridge In Lieur Of Lc No. 23 Kothanalloor Gate At Rly Km 43/500-600 B/w Kuruppanthara And Ettumanur Stations Of Trivandrum Division 7.50m Two Lane Carriageway, 1x30m Eff. Composite Girder For Railway Spans And 8x25m Psc Girder For Approaches
Signalling And Telecom Outdoor Cable Shifting Work Including Other Gears Inconnection With Following Work: I Strengthening/rehabilitation/reconstruction Of 10 Nos. Of Bridges Bridge No- 20, 25, 29, 65, 49, 48, 38, 41, 76 & 86 5 Nos. Box And 5 Nos. Pipe Pushing In Tkx-bksc-ksx-muri Section Of Adra Division. Project Id: 12.01.32.24.3.50.009, Ii Proposal For Conversion Of 11 Nos. Of Bridge No. 35, 36, 34up, 34dn, 343rd, 528, 528, 528, 528, 11 & 2bk 1x12.2mg Span Steel Girders Into 1x12.2mg Psc Girder Including Rcc Jackting Bet Adra-asansol, Ksx-bksc, Tle-bksc And Dma-kpk Section In Adra Division. Project Id: 12.01.32.24.3.50.006, Iii Construction Of New Crew Lobby, Crew Waiting Hall, Crew Counseling Room, Toilet For Ladies & Gents On The 1st Floor Of The El Building At Anara.project Id: 12.01.16.21.1.55.002, Iv Estimate In Connection For Augmentation Of Existing Crew Lobby At Bksc.project Id: 12.01.16.21.1.55.002, V Provision Of Earth Leakage Detector Eld In Various Location In Adra Division.project Id: 12.01.33.24.4.50.001. Vi Strengthening/rehabilitation/reconstruction Of Bridges, 31 No. By Pipe Pushing And 08 No. Rehabilitation In Mdn-gba Section. Project Id: 12.01.32.23.1.11.002. Vii Strengthening/rehabilitation/reconstruction Of Bridges, 27 No. By Pipe Pushing And 08 No. Rehabilitation In Gba. Project Id: 12.01.32.23.1.11.003 In Adra Division.
Replacement Of Existing Steel Girder Bridges With Psc/rcc Slabs Bridge No.296, 303 Samt-sa Section