Laying And Jointing Of Rcc Ugpl Works, Fixing Of Arv, Aav, Gv/Sluice Valves, Construction Of Haudies And All Other Allied Works. Laying Of Rcc Underground Pipeline Works
Work Of Design And Construction Of Rcc Esr Connecting Pipeline And Pumping Machinery At Ladjipura (meloj),ta-siddhpur,dist-patan Under 15 Percentage Vivekadhin Yojana 2024-25 ( Deposit Work)
Construction Work Of Rcc Strome Water Pipeline Pole As Per Various Location Chart At. Wankaner Under Swarnim Jayanti Mukhya Mantri Saheri Vikash Yojana Udp-88 Year-2023-2
Providing And Laying Stormwater Pipeline & Constructing Of Rcc Box Drain For The Storm Water Drainage System
Augmentation Of Storm Water Drainage System By Providing And Laying Of 450Mm 18 Inch I/D Rcc Np-2 Pipeline, Construction Of New Machine Holes And Road Gullies Near H.No.107 To 132, Sector 28-A, Chandigarh For Smooth Disposal Of Rain Water
Relining/Lining By Laying U/G Rcc Pipeline Of Water Course Of Rd O/L R.D 6430-R Of Banbhora Village Distt. Sangrur
Modakhera, Adampur Laying Of Rcc Pipeline From F/O Heeralal Kaswan To F/O Ramparsad Vangy
Munsiwali Laying Of Rcc Pipeline 450Mm Dia From Bus Stand Basti To Pond Block Ratia Distt Fatehabad Munsiwali - Laying Of Rcc P...
Extension Of Existing Under Construction Shed By 48 Meters Fit For Eot Crane, Construction Of G+1 Lean To Roof Building Of Size 48 Meters X 5 Meters, Construction Of 48 Meters X 5 Meters Along The Length Of Shed For Machine Installation Along With Store Room, Compressor Room, Water Hydrant Pipeline And Rcc Flooring Outside Shed (50 Meters) And Rewa Construction Of One Store Room Of Size 15m X 17m And Compressor Room Of Size 13m X 5m And Rcc Flooring Outside The Shed (sidhi End) Of Approx. 50 Meters (part Of Work :- Extension Of Existing Integrated Sick Line Of Rewa Shed By 48 Meters.
Work Of Laying 740 Meters Of 250 Mm Diameter Rcc Hume Pipeline, Construction Of 76 Manhole Chambers, And Provision Of 77 House Connections In Various Streets Of Mohalla Rabdi Tola.