Construcion Work Of Bhanwar Siyag House To Tiku Maharaj House, Bhagwan Pachar House Hadman Sharma House Etc. Ward No. 06, Nokha Road Works
Construction / Upgradation Of Road/ Cd Works Including Maintenance For Five Year After Construction. Rbr-Bridges Mp02rbr01/Badwani
(a) Electrical General Work In Connection With Engg. Work "construction Of New Fob (6m Wide) At Prna". (b) Electrical General Work In Connection With "provision Of 6m Wide Fob With Ramp And Other Ancillary Works At Azamnagar Road (azr) Station Of Katihar Division." (c) Electrical General Work In Connection With "provision Of 6m Wide Fob With Ramp And Other Ancillary Works At Telta (teta) Station Of Katihar Division." (d) Electrical General Work In Connection With "provision Of 6m Wide Fob With Ramp And Other Ancillary Works At Sudhani (sud) Station Of Katihar Division."
Construction Of Road Wrok From Sujangarh Road South Side To Kanhaiyalal Paliwal Prabhu Premi House To Dunger Maharaj Shope To Sohanlal Bhaat House Ward No. 28 And 26 Nokha. Road Works
Electrical Trd Work Inconnection With "schedule-a:-provision Of 6m Wide Fob With Ramp And Other Ancillary Works At Azamnagar Road (azr) Station Of Katihar Division. Schedule-b:-construction Of New Fob (6m Wide) At Prna"
Construction Of 60 Mtr Span Steel Girder Foot Bridge Over River Tawi At Kokaini Tehsil Latti Under Ut Capex Road Sector/new Works 2025-26 On Epc Mode.
Irrigation and or road and building related works along with labour and materials in Bhiloda Range in Arvalli Forest division modasa
Provision Of Limited Height Subway (lhs) With Ei (make: Hitachi) In Lieu Of Existing Manned Level Crossing No. Lc-357 At Km 661/19-21 Between Bav-mms Stations Of Kur Division And Execution Of Prime Target Works In Khurda Road Division.
Resurfacing Strengthening And Other Works For Limbuni Custom Road Km. 0/0 To 4/780
Balance Work Of Earthwork In Formation, Blanketing And Protection Works In Between Km 12.400 To 13.600, Km 17.800 To Km 18.00, Km 19.100 To Km 22.520, Km 23.700 To Km 24.500, And Km 27.900 To Km 30.300 (total 8.02 Km), Construction Of 01 No. Island Pf At Kdpr, Pp Shed At Kdpr, Circulating Area With Approach Road At Kdpr, Balance Works Of Minor Br/rub 5a, 6a, 6b, 9a, 11a, 11b And 11c (br. No. 11 C - For Both Existing And Proposed Dl), Construction Of 16 Nos. Type-ii Quarters And Dismantling Of Existing 16 Nos. Quarters At Kdpr Station Other Ancillary Works In Between Section Kuretha-kumedpur In Connection With Katihar- Kumedpur Doubling Project Of N. F. Railway (construction) On Epc Mode