Supply And Installation Of Heavy Duty Pallet Shelving Rack System..
Supply Of Stainless Steel 5-shelf Shelving Units And Storage Rack On Wheels With Shelf Liners Set Of 5, Sf Certified, Steel Bar Shelving Unit Rack For Kitchen/office, 72h X 72w X 18d, Material: Stainless Steel, Number Of Shelves: 5, Style Shelf, Finish.
Gem Bids For Stainless Steel Wire Shelving Rack Or Pot Rack Q3
Gem Bids For Stainless Steel Wire Shelving Rack Or Pot Rack (q3) , Tower Bolts (non-ferrous Metals) V2 As Per Is 204 (q2)
Gem Bids For Stainless Steel Wire Shelving Rack Or Pot Rack Q3, Bathroom Or Toilet Mirror V2 Q4, Tower Bolts Non-ferrous Metals V2 As Per Is 204 Q2
Gem bids for Kitchen, Food Pick Up Counter With 1Bs And 2Ohs, Pick Up Table, Food Warmer, Chapati Collection Table, Chapati Plate Withpuffer, Chapati Rolling Table, Tandoor, Spreader Table, Exhaust Hood, Work Table, Chinese Range, Griddle Plate, Deep Fat Fryer, Two Burner Indian Range, Work Top Withunder Counter Refrigerator, Work Table With Sink, Wallshelf, Atta Maida Bin, Dough Mixer Or Atta Kneader, Salamander, Pizza Oven, Two Door Freezer, Deep Freezer, Juicer, Sandwich Griller, Toaster, Meat Mincer, Potatoonion Bin, Wet Masala Grinder, Potato Peeler, Vegetablecutting Machine, 4 Door Reach In Refrigerator 1200 Ltrscapacity, Vegetable Washing Sink Unit, Platform Trolley, Weighing Scale, Ms Store Room Shelving, Dunnage Rack, Bottle Cooler, Ice Cream Cabinet, Beverage Table Withsink, Water Boiler, Milk Warmer, Espresso Coffee Machine, Water Cooler, Dirty Dish Landing Table With Sink Andoverhead Glass Rack Shelf, Garbage Can, Pre Wash Tablewith Sink, Dish Washing Machine, Exhaust Canopy Overdish Washing Machine, Clean Dish Landing Table, Wallmounted Rack Shelf, Clean Dish Rack 4 Shelves, Pot Rack, Pot Wash Sink Unit, Ducting For Hot Air And Fresh Air, Lpggas Pipe Line, Comprehensive Maintenance Charges Forfirst Year, Comprehensive Maintenance Charges For Secondyear, Comprehensive Maintenance Charges For Third Year
Gem Bids For Self Ballasted Led Lamps For General Lighting Services (v2) Conforming To Is 16102 (q2) , Led Batten (q2) , Led Luminaire For Road And Street Lights (v2) Conforming To Is 10322 (part 5 / Section 3) (q3) , Led Garden Light (v2) (q2) , Mcb - Miniature Circuit - Breakers For A.c. Operation As Per Is / Iec 60898 (part 1) (q2) , Molded Case Circuit Breakers (mccb) As Per Is / Iec 60947 (q3) , Pressure Sensitive Adhesive Plasticized Pvc Tapes With Nonthermosetting Adhesive As Per Is 7809 (part 3 / Section 1) (q3) , Bathroom Or Toilet Mirror (v2) (q4) , Led Bulb With Battery As Per Is 16102 (q3) , Wire Mesh Fabric Or Cloth (v2) As Per Is 1568 (q3) , Stainless Steel Wire Shelving Rack Or Pot Rack (q3)
Gem Bids For Stainless Steel Wire Shelving Rack Or Pot Rack Q3, Bathroom Or Toilet Mirror V2 Q4, Led Bulb With Batteryas Per Is 16102 Q3, Led Luminaire For Road And Streetlights V2 Conforming To Is 10322 Part 5 / Section 3 Q3, Molded Case Circuit Breakers Mccb As Per Is / Iec 60947q3, Mcb - Miniature Circuit - Breakers For A.c. Operationas Per Is / Iec 60898 Part 1 Q2
Supply And Installation Of Heavy Duty Shelving Storage Rack For Traction Motor With Metal Pallets Size-3460 Mm C/L X 1400 Mm D X 4800 Mm H, Total Load Bearing Capacity: 18 Ton As Per Specification Attached..
Gem Bids For Stainless Steel Wire Shelving Rack Or Pot Rack Q3