Dinhata Balarampur Chilakhana Rd, From 0.00 Km To 20.00 Km, Widening From Carriageway 5.50 M To 7.00 M And Strengthening Works Including Const Of 5 Cd Structures, 4580 M Protection Work, 3170 M Drainage Work
Work of Erection of Structures, Equipments, Earthing, Control Wiring, Yard Lighting, Control-Room & Electrification etc. for 2X15MVA, 66/11kV Bhavanigadh Sub-Station.
Widening And Strengthening Of Single Lane To Four Lane Of Annapureddypally - Mulkalapally Road From Km 0/300-2/0 In Bhadradri Annapureddypally Town Limits Sub Work- Dismantling Of Structures And Encroachments Removal
Hematpur Tatarpur Road From 0.00 To 8.740Km, Widening And Strengthening Work Including Paver Block Portion Of 1000M, Construction Of 3No. Of Cd Structures, 366M Protective Work And 1248M Drainage Work Under Midnapore Hway Divn. Under Ridf-Xxxi Hematpur Tatarpur Road From 0.00 Km To 8.740 Km, Widening And Strengthening Work Including Paver Block Portion Of 1000M, Construction Of 3 No. Of Cd Structures, 366 M Protective Work And 1248 M Drainage Work
Work Of Erection Of Structures, Equipment, Earthing, Control Wiring Etc. For 02 Nos Of 66Kv Transformer Bays And 04 Nos. Of Feeder Bays For Various Transmission Line Approved Under R & M Plan 2025-26 Under Vyara Am Division Of Navsari Circle.
State Plan-2025 - 26 -Tss - Construction Of New Well-And Connected Work At Plamoodu Pump House-Sewerage Work-Construction Of New Well And Allied Structures-General Civil Work
Stone Work, Earth Work, Structural Work Renovation Of Petanalla From Rd 00 M To 2700M With Structures Including Balance Work Of Phase- I In Cuttack City. From Rd 1930 Mtr Krusaka Bazar Bridge To Rd 2700 Mtr Bidanasi Bridge, Reach-I
Stone Work, Earth Work, Structural Work. Renovation Of Petanalla From Rd 00 M To 2700M With Structures Including Balance Work Of Phase- I In Cuttack City. From Rd 1090Mtr Aswini Hospital Bridge To Rd 1930 Mtr Krusaka Bazar Bridge Reach- Ii
Construction Of Covered Shed And Platform For Cleaning, Grading Packaging Plant At Mandi Yard And Repair Work Of Existing Structures At Mandi Yard
Surface Cleaning And Painting Work Of Tower Structures Of 400kv Seoni-sarni S/c Ehv Line Under Tlm Sub Dn., Seoni And Chhindwara Under Administrative Control Of Eht-maint. Dn Seoni On Labour Contract Basis