Gem Bids For Multi-protocol Label Switching Servicemplsservice
Design, Supply, Erection, Testing And Commissioning Of 220kv/2x25 Kv Scott Connected Traction Sub Station And Switching Posts With At Feeding Between Bilaspur Excl. - Tilda -durg Incl. And Raipur-lakholi Section Of Raipur Division Sec Railway In Connection With Up- Gradation Of Electric Traction System From 1x25 Kv To 2x25 Kv Traction System Of Secr To Meet 3000 Mt Loading Target
Design, Supply, Erection, Testing & Commissioning Of 25 Kv Ac Single Phase Ohe For The Electrification Work Of Crossover Shifting At Rosa, Rob In Lieu Of Level Crossing No.352 C Class At Km 1288/17-19 In Pitamberpur Station Yard On Lucknow-moradabad Section, Rob In Lieu Of Level Crossing No.51 Spl Class At Km 78/130.201 In Sitapur City Station Yard, Bridge No.13 Dn Main Line At Rly. Km. 14/305.923 On Sarda Canal And Switching Post Sp At Sitapur City On Rosa-sitapur City Section Of Moradabad Division.
Gem bids for Idsc, Desktop Computer, Visualizer, Projection System, Switching And Matrix Switchers, Podium, Biometric System, Mobile Jammer, Fire Alarm, Cctv System, Online Ups 5Kva, 24 Port Manageable, 16 Port Manageable, 4U Switchrack, Utp Cable Cat 6, Rj 45 Connector Electric Wireswithches Cramping Tools Line Tester, 600 Va Ups
Gem bids for 2.0-2.2 Ton Split Air Conditioners Inverter Model, 5 Kva Orhigher, 230 Volt, 50 Hz Ac Voltage Stabilizer Suitable For 2-Ton Ac, 2/3 Channel For Ac Automatic Switching Betweentwo No. Of Ac Suitable For 2-Ton Ac
Gem Bids For Est, Standalone Pc, Adn Pc, Visualiser, Projection System, Networking Switching, Podium With Integrated Control Andannotation, Biometric System, Mob Jammer, Cctv System, Fire Alarm System, Online Ups 5 Kva
Maintenance Including Switching On And Off Operation Of All Electrical Equipments Of 2 Nos. Sub-ways -- One From Science City Gate To Milan Mela Gate And Other From Science City Gate To Energy Park -- For A Period Of 16 Months. 11 / Ee / Ed-i / Em / Kmda / T-2 / 2025-26
Supply Erection Testing And Commissioning Of 132kv Dc Line From 132kv Switching Station Pedana To 132kv Machilipatnam Port 2 Nos 132kv Bays At 132kv Switching Station Pedana Under Construction And 2 Nos 132kv Metering Bays At Machilipatnam Port In Krishna District On Turn Key Basis
Gem Bids For Multi-protocol Label Switching Servicemplsservice
Survey Of 400 Kv Anpara-obra Sc Line Lilo At Proposed 400 Kv Switching Substation Renukoot Hindalco, Layout And Resistivity Work Of Proposed 400 Kv Switching Substation