Bpl Div: Conducting Survey & Digitization Of Existing Underground Signalling And Telecommunication Cables With Rtk (real Time Kinematics)/ Dgps (differential Gps) Technology Using Gnss (global Navigation Satellite System) Including Preparation Of Digitalized Signalling And Telecommunication Plans Over Entire Bhopal Division.
Gem Bids For Custom Bid For Services - Work Package For Maintenance Ofcampus Wide Telecommunication System
Signal And Telecommunication Work In Connection With Development Of Ballast Depot For Increasing The Ballast Capacity At Doravari Chatram (dvr) In Chennai Division.
Signal & Telecommunication Work In Connection With Madurai Division - Ten-tsi & Mdu-vpt Section:-extension Of Platforms, Platform No. 1 & 2 In Smd, Kky, Pcm And Pf No.1 In Kic, Asd & Tdn Stations And Mdu-bdnk & Mdu Bg Section - Extension Of Pf No. 1 At Usilampatti (uslp-nsg 6) And Pf No. 2 At Vadipatti (vdp- Nsg 6) Stations
Comprehensive Signalling And Telecommunication Works For Provision Of Automatic Block Signalling System In Chinnaganjam (cjm)-tsunduru (tsr) Section Of Vijayawada Division In South Central Railway
Howrah Division-signalling Work In Connection With- Schedule A1- Construction Of New Lhs In Lieu Of Lc Gate No.18 By Railway's Relieving Girder Under Aen/ndae. Schedule A2- Construction Of New Lhs In Lieu Of Lc Gate No.18 By Railway's Relieving Girder Under Aen/ndae(telecom). Schedule B1-construction Of New Lhs In Lieu Of Lc Gate No.12a/1 By Railway's Relieving Girder Under Aen/ndae. Schedule B2-telecommunication Cost For Construction Of Lhs At Gate No. 12a/1/e At Km. No. 53/33-35 Between Station Dtae-smae Under Jurisdiction Of Aen/ndae. Schedule C1-construction Of New Lhs In Lieu Of Lc Gate No.17/a/6 By Railway's Relieving Girder Under Aen/ndae. Schedule C2-construction Of New Lhs In Lieu Of Lc Gate No.17/a/6 By Railway's Relieving Girder Under Aen/ndae(telecom).
Telecom Work For Strengthening Of Telecommunication Infrastructure In Lko-sln- Zbd Section Of Lucknow Division Of Northern Railway In View Of Upcoming Inspection.
Signal And Telecommunication Work In Connection With Construction Of Rub By Nhai For Traffic Lc-no.162 @ Hlk Yard & Interlocked Lc-no.20 @ Cta Yard. [allocation:008445-21]
Execution Of Signaling & Telecommunication Work In Connection With: (1) Through Turn Out Renewal 86 Sets [bmy-76 Set (cs+cms) And Durg-drz - 10 Sets (tws+wcms)], (2) Through Rail Renewal (primary) - 64.595 Kms.
Supply Of Telecommunication Switch Board Cable.