Reapplication Of New/old Ceramic Pad Insulation For Hpt/ipt Turbine Modules Of 2x210 And 2x250mw, Ghtp, Lehra Mohabat. Supply And Application Of Thermal Insulating Material On Boiler, Turbine Side Piping, Valves, Hp/lp Piping And Mechanical Auxiliaries And Incorporation Of Removal/ Repair/
Laying Of The Fire Water Lines Along Mill Workshop Near Unit 2 Boiler Of Meja Thermal Power Project
Gem Bids For Items, Optical Fibre Numerical Aperture Trainer Kit Description, Airwedge Glass Plate, Lens For Newtons Rings, Mercuryvapour Lamp With Transformer, Thermal Conductivity Leesdisc Steam Boiler Pipe, Newtons Rings Experiment Full Setup, Laser Experiment For Determination Of Wavelength, Revolving Stool, Anti Static Sheet On Table Blue Colour Size2 Ft By 3 Ft, Windows Curtain Size Roller Curtain W100 By L130 Cm, Acrylic Sandwich Board 3 Ft W By 5 Ft H, Acrylicsandwich Board 3 Ft W By 4 Ft H, Kevlar Gloves Pairs 14 Inch, Alkon Plastic Components Cup Board, 1.5 Ton Invertersplit Air Conditioner With Stablizer And Installation, Drawerfor Documents Holds, Extension Board - 5amp And 15amp, Fire Extinguisher 500gms Bottle, Cap Holding Stand 4 Ft By5 Ft For 30 Caps, Stainless Handwash Towel Hanger, Blackcloth For Experiment
Gem Bids For Repair And Overhauling Service - Replacement Of Existingcorroded Seal Trough & Hopper Plate And Erection Of Newseal Trough & Cladded Hopper Plate Along With The Supply Ofmaterial; 500 Mw Thermal Power Station - Boiler; Yes; Buyerpremises
Gem Bids For Repair, Maintenance, And Installation Of Plant/systems/equipments Version 2 - Thermal Power Plant;thermal Insulation For Boiler And Auxiliaries;service Provider
Gem Bids For Custom Bid For Services - Rate Contract For Thermal Insulation Of Boiler Coal Mill Ahp And Turbine Aux Excluding Spray Insulation For 2two Year U1 2 Rtps Dvc
Thermal Insulation Of Boiler Drum, Crh Header, Bottom Header Area And Drain And Vent Line Of Unit 7, Dpps During Overhauling Period
Annual Contract For Supply And Application Of Thermal Insulation Sheeting In Boiler, Turbine And Other Area Of Unit 7 And 8, 660Mw At Ssctps, Rvun, Suratgarh. Tn/Stps-Sc /2024-25/206Boiler
In-Situ Thermal Spray Coating Of Boiler Tube By Hvof High Velocity Oxygen Fuel Technique During Overhauling Of Unit 5, 2X500 Mw, Btps, Anpara Thermal Spray Coating
Work Of Thermal Insulation At Boiler Lagging