Supply of Set Of Pipelines For Schneider Vcb. Set Set Of Pipelines For Schneider Vcb. Set Consists Of 7 Items, 7 Nos. As Per Annexure A Enclosed..
Supply Of Set Of Items For Aal Make Vcb Of Type 25.10 Tr. Set Consist Of 3 Items As Per Annexure Enclosed. Make : Aal Only..
Supply Of Earthing Switch For Vcb With Locking.
Supply Of Spring Loaded Switch Pantograph, Vcb/hotel Load Zpt/bldj/blho, Type Sbm F/tou/21/22/r20. Clw Spec.no-clw/es/3/0075 Alt-b With Latest Alteration.
Gem Bids For Spares For Fcma Panels Vcb Installed
Supply Of Ioh Replacement Kit For Vcb Of M/s Schneider Electric Type 22cb.
Gem Bids For Vcb 800A Vk 10L40h L&T, Relay Micom Agile P242 P40
Gem Bids For Supply, Supply And Fixing Transformer Gasket, Supply Backelitsheet 4 Mm, Fuse Hpl Lkdn-00 10 A, Fuse Hpl Lkdn-0016 A, Fuse Hpl Lkdn-00 20 A, Fuse Hpl Lkdn-00 32 A, Fuse Hpl Lkdn-00 63 A, Fuse Hpl Lkdn-00 100 A, Relaytesting Including Inbuilt Relay, Thermography Of Feeder, Cable Insulator Clamp 150 Ampere, Supply Of Cable Polycab4 Core 4 Sqmm Armoured, Supply Of Control Cable Polycab3 Core 1.5 Sqmm Armoured, Electrical Panel With Sfu 250Amp 3Pole And Neutral, Ryb Indicator, Mcb 2 Pole 6Amp, Mcb 2 Pole 32Amp, Mcb Single Pole 20 Amp, Mcb Singlepole 32 Amp, Mcb Single Pole 63 Amp, Cable Connector0.5 To 10 Sqmm, Cable Connector 16 Sqmm, Starter 3 Hpnon Flp, Transformer Oil Testing, Transformer Oil Filtration, Healthiness Testing Of Vcb Bottles, Calibration Of Wti Otirelays Of Transformer, Suppy And Installation Of Ctpt33kva Line
Overhauling/maintenance Of 33kv Vcb Installed At 220kv Substation Sarh Kanpur Under Etd-ii
Annual Maintenance Work Of 33/11 Kv Vcb/control Panel Installed At 33/11 Substations Under Electricity Distribution Circle-i