Fatehgarh Gursahaiganj Marg Sh 29a Ka 04 Lane Widening And Strengthening Chainage 24 000 Se 31 880
Widening From Two Lane To Four Lane And Strengthening From Km 10/0 - 20/0 Of Polur -chengam Road Sh-133 Including Construction Of Center Median, Construction Of Additional High Level Of Bridge At Km 11/4, Widening Of Box Culverts At Km 10/6, 10/8
Widening Of Existing Two Lane To Four Lane Of Suratgarh-sri Ganganagar Section From Km. 175.000 To Km. 250.900 Of Nh-62 In The State Of Rajasthan On Epc Mode.
Widening And Upgradation To Lane With Paved Shoulder From Km 114.650 Shahpura Bypass To Km 158.650 Jahazpur Of Gulabpura Uniara Section Of Nh 148d Total Length 44.00 Km Under Nho
Widening From Intermediate Lane To 2 Lane And Strengthening At Km 0/0 - 6/0 Of Pudupalayam -ponnarampatty Road Including Construction Of Box Culvert In Lieu Of Existing Damaged Cut Stone Culvert At Km 0/4, 0/8, 0/10 And 3/2
Two-lane Widening And Strengthening Work Of Baheri Bahpur Nadeli Bhudia Colony Other District Road Under State Planin The Financial Year 2025-26 With 05 Years Maintenance
Six-lane Widening And Strengthening Work Of The Bareilly Bada Bypass To Satellite Bareilly Old National Highway-74 Urban Section, Chainage 0.00 To 11.320 Fy 2025-26
Four Lane Widening And Strengthening Work Of Sikandrabad Dankaur Road Odr From Chainage 0.000 To 2.300
Widening 2 Lane To 4 Lanes And Strengthening Including 02 Major Bridges, Of The Intauja Mahona Kumhraon Kursi Deva Chinhat Road M.d.r.-88c In District Barabanki From Chainage 18.500 To 45.850
Widening From Two Lane To Two Lane With Paved Shoulder And Strengthening At Km 8/0 - 10/6 Of Katpadi Vallimalai Road M607- Tvm-115 Tn No 72 2025 26 Hdo Dt 23 12 2025 Tvm 115