Construction Of 50 Nos. New 125mm Dia X 45 M. Deep Gravel Packed T/w With India Mark Ii Hand Pump With Construction Of 1.85mtr Dia Circular P.c.c (1:2:4) Platform, P.c.c (1:2:4) Drain As Per Unicef Designand 1mtr Dia X 2.0m Tr Deep Soak Pit Under P.h.division, For The Year 2024-25