Maintenance Of New Drain From Rd 0 M To Rd 5300 M Including Supply And Installation / Fixing Of Floating Trash Barrier Near Rd 0 M, Rd 1100 M, Rd 3400 M An Rd 4900 M Of New Drain For Collecting Floating Material, Hyacinth Etc. From Water Surface A/r And M/o Drains