Sitc Of 9.5 Tr Precision Air-conditioning Pac System Along With Associated Electrical Works Of Data Center And Dismantling Of The Existing Old Pac Units With Buy Back Option At Ground Floor, Chemical Engineering A Block, Iit Hyderabad Sitc Of 9.5tr Pac System Along With Associated Electrical Works Of Data Center And Dismantling Of The Existing Old Pac Units With Buy Back Option At Academic Block-a, Iit Hyderabad