Fdr/ Maintenance Of Road From Satchand -Bankul Road To Sevadhan Para L-1.50 Km During The Year 2025-26 / Sh -Construction Of 1One No. Rcc Boxcell 5.00M X 5.00M, Tripple Cell At Ch.3.874 Km Over Local Cherra And Approach Road Etc.