Production Of 25, 000 Tonnes Of Industrial Grade Salt In 42 Beds By Semimechanization Method Including Charging, Raking, Scrapping, Collection, Hauling And Heaping Of Scrapped Salt In The Centralized Platform A Mvsc, Valinokkam 01.04.26 To 31.3.27 Production Of 25, 000 Tonnes Of Industrial Grade Salt In 42 Beds By Semimechanization Method Including Charging, Raking, Scrapping, Collection, Hauling And Heaping Of Scrapped Salt In The Centralized Platform At Mvsc, Valinokkam