Soil Exploration Work Detail Of Sub-Soil Investigation For The Work Improvement To Storm Water Rcc Drain From Nh-16 To Salandi River In Bhadrak Municipality Under Salandi-Baitarani Doab-Xiii
Gem Bids For Custom Bid For Services - Geotechnical Investigation Sub Soil Exploration For Provision Of Civil Work Infrastructure For Installation Of Aircarft Arresting Gear At Ins Dega Visakhapatnam-
Construction Of High Level Bridge Across Nsp Canal At Km 14/10 Of Addanki - Santhamaguluru Road Sw:- Conducting Soil Investigation And Sub Soil Exploration, Soil Testing And Pre Survey For Construction Of High Level Bridge Across Nsp Canal At Km 14/10 Of Addanki - Santhamaguluru Road
Sub Soil Exploration Of Different Non-i And Wd Field Channels Under
Sub Soil Exploration Of Soa River Soa Khal And Behula River
Sub Soil Exploration Of Cut Kunti Channel And Janai Basin Khal
Conducting Surveying And Levelling Operation And Sub Soil Exploration For Preparation Of Detailed Project Report For Formation Of In-Stream Storage Structure Across River Kosasthaliyar In Between Thamaraipakkam Anicut And Poondi Reservoir In Tiruvall
Conducting Surveying And Levelling Operation And Sub Soil Exploration For Preparation Of Detailed Project Report For Formation Of In-Stream Storage Structure Across River Kosasthaliyar In Between Kaveripakkam Tank In Ranipet District And Manavur- Ch
Conducting Surveying And Levelling Operation And Sub Soil Exploration For Preparation Of Detailed Project Report For Formation Of In-Stream Storage Structure Across River Kosasthaliyar In Between Irulipattu Checkdam And Thamaraipakkam Anicut In Tiruv
The Major Components Of The Project Shall Include But Not Limited To 1. Survey And Geological Investigation Including Sub Soil Exploration. 2.Excavation/Dredging Of Earthen Mound/Island In The D/S Of Supa Dam. 3.Design And Construction Of Coffered Dam/Bund.4.Design And Construction Of Rcc Cast In Situ Bored Piles. 5. Design And Construction Of Steel Sheet Piles.6. Design And Construction Of Rcc Retaining Wall.7.Design And Construction Of Earthen Embankment.8.Design And Construction Of Asphalt Roads And Rcc Drains.