Mahishadal Geonkhali Road, From 1.50 Km To 4.00 Km And 6.00 Km To 8.00 Km, Temporary Patch Repairing Work By Repairing Potholes, 20 Mm Pc, Sc And Other Allied Works In Stretches Under Tamluk Highway Division